Concrete Pour 1/22
January 23, 2011 at 1:43 am Leave a comment
Today we poured our third and final (for now) batch of concrete. We had a great showing of over a dozen students, including three new faces (two from the landscape architecture department!). After we pull this formwork off, we’ll be done with all our formwork and working way above ground for the rest of the term. Bring on the scaffolding.
We are rockin’ and rollin’ and ready to cut some beautiful wood beams! Below is a time lapse video from today and from our second pour on December 4th.
![]() |