Concrete Pour 1/22

January 23, 2011 at 1:43 am Leave a comment

Today we poured our third and final (for now) batch of concrete. We had a great showing of over a dozen students, including three new faces (two from the landscape architecture department!). After we pull this formwork off, we’ll be done with all our formwork and working way above ground for the rest of the term. Bring on the scaffolding.

We are rockin’ and rollin’ and ready to cut some beautiful wood beams! Below is a time lapse video from today and from our second pour on December 4th.

Video from January 22nd on Camas Pedal Bike Shelter
Video from December 4th on Camas Pedal Bike Shelter

 

 

 

This slideshow requires JavaScript.

Entry filed under: Uncategorized. Tags: .

We’re making moves at Camas Ridge… 2/26 Beam Raising

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Subscribe to the comments via RSS Feed


Without the generous donations by members involved in the community, this bike shelter would not exist. A HUGE Thank You to:

Hoffman Construction for unbelievable project mentoring and outreach!
WW Steel for an enormous steel donation!
Fortis Construction For concrete and formwork
EWEB for hauling out our excavated asphalt and soil
Pennington Painting Company for painting our steel structure
Farwest Steel for rebar
Safe Routes to School for Bike Racks
Knife River Prestress for the field trip and rebar bending
Zip-O-Log Mills for their beautiful, donated dug-fir lumbar


Follow

Get every new post delivered to your Inbox.